Open towers, ready for their first tenants.
Macro towers across the Southeast and Midwest, for carriers, wireless internet providers, broadcasters, utilities, and public-safety agencies. No tower has a tenant yet. Any height you ask for is subject to a passing structural analysis.
Every site.
The facts a site acquisition team looks up first, for every tower we own. Download the list for your own tools, or open any tower page.
| Code | Site | County | Structure | Structure height | Overall height | FCC ASR |
|---|---|---|---|---|---|---|
| 420001 | Arbela, MI | Tuscola | Self-Support | 225 ft | 230 ft | 1288682 |
| 420002 | Bushnell, MI | Montcalm | Self-Support | 195 ft | 199 ft | 1266735 |
| 420003 | Clio, MI | Genesee | Monopole | 150 ft | 155 ft | 1287615 |
| 420004 | Fulton, MI | Gratiot | Self-Support | 195 ft | 199 ft | 1265841 |
| 420005 | Montrose, MI | Saginaw | Self-Support | 195 ft | 199 ft | 1267675 |
| 420006 | Sequatchie, TN | Marion | Self-Support | 300 ft | 320 ft | 1211014 |
| 420007 | Cartwright, TN | Sequatchie | Self-Support | 300 ft | 320 ft | 1207959 |
| 420008 | Duck Springs, AL | Etowah | Self-Support | 300 ft | 320 ft | 1208020 |
| 420009 | Huntsville/Rideout, AL | Madison | Monopole | 140 ft | 148 ft | 1213056 |
| 420010 | Rockmart, GA | Polk | Self-Support | 300 ft | 320 ft | 1200693 |
| 420011 | Clover, SC | York | Guyed | 260 ft | 268 ft | 1056284 |
Overall height is the FCC-registered figure and includes the lightning rod. It is not a mounting height. The list carries each tower’s registered coordinates.
What you can check before you write.
What we publish for every site, what a qualified party can see under NDA, and what only a Site Application settles.
Public now
On every tower page and in the Site List.
- Structure type, structure height and FCC overall height
- Tenants and the heights open to lease
- Land: fee-owned or ground-leased
- Year built, where known
- FCC ASR registration and registered coordinates
- Site photo, where we have one
- The Site List and map file, to download
Under NDA
Each tower page lists the documents we hold for that site.
- Ground-lease rent, escalators and term
- Tower design drawings
- Title commitment and survey
- Environmental reports
- FAA filings
- FCC filings
Still needs review
A Leasing Inquiry is free and starts no engineering.
- Whether the tower carries your equipment at your height. A Site Application starts a structural analysis by a licensed engineer.
- The mounting height and ground space for your equipment.
- Your installation drawings, approved before notice to proceed.
Four steps to notice to proceed.
Leasing inquiry
Tell the leasing desk who needs the space, the site or the area, and what goes up. A reply within 2 business days.
Site application
An application names the equipment and the height. Its fee pays for a structural analysis of that loading by a licensed engineer.
License agreement
With a passing analysis, a license agreement sets the terms for the space on the tower and on the ground.
Notice to proceed
With the agreement signed and the drawings approved, notice to proceed opens the site for installation.
Ask about a site.
Name the site or the area, who the space is for, and the equipment if you have it. The leasing desk replies with the site's facts and the next step.
leasing@trinityriverassets.com
1-833-869-3763